Case Study
Ascot Racecourse
Steel Superstructure Survey, Cleaning and Painting
The Challenge
Stadium Support Services was appointed by Ascot Racecourse to complete a condition survey of the grandstand’s steel superstructure. Following a detailed assessment, we were instructed to carry out specialist cleaning and protective painting works to help preserve this iconic venue.
With no existing reports or access plans in place, Ascot Racecourse needed a full condition survey of its steel superstructure from the ground up. The challenge was to access a previously unaccessed grandstand develop a safe access strategy and deliver a long-term protection solution, while working around the venue’s live calendar to ensure minimal disruption
Scope of Work
- Condition survey of coatings and passive fire protection
- Rope access cleaning of external steelwork
- Internal steelwork cleaned using MEWPs and specialist equipment
- High-level pigeon spikes removed, cleaned and replaced
- External window cleaning integrated into the programme
- Cantilever brackets and structural steelwork prepped, primed and repainted
The Solution
Following the condition survey, our team used rope access and specialist equipment to restore both internal and external steelwork. Works included the replacement of high-level pigeon spikes and the full repainting of structural cantilever steels. The result was a fully restored superstructure, protected for the future, backed by warranty and supported with a clear long-term maintenance plan for Ascot.
“The team at Stadium Support Services were professional, reliable and safe. Working with them on a complicated project was made easy thanks to their clear communication, we felt informed throughout. They delivered on time and we are really pleased with the results.”Lee Chalk, Head of Facilities, Ascot Racecourse

5,000sqm
cleaned

100+
days

60m
working at height
