Case Study
Wycombe Wanderers FC, Adams Park
Wycombe Wanderers FC, Adams Park
Supply & Installation of New Dugouts
The Challenge
The works required close coordination with contractors delivering wider pitch renovations. The dugouts needed to be relocated closer to the stands to improve sight lines for fans, while ensuring compliance with local authority approvals. All activity had to be completed within tight timelines ahead of the new season.
Scope of Work
-
Enabling Works: Ground preparation and service connections for the new dugout locations
-
Design & Manufacture: Bespoke dugouts developed and produced to club specifications
- Home & Away Dugouts: Supply and installation of two dugouts, each with 22-person capacity
- Referee’s Dugout: Installation of assistant referee’s dugout with space provision for future VAR facilities
- Seating & Branding: Bespoke seating supplied with the Wycombe Wanderers crest embroidered
- Heating & Electrics: Electrical systems installed to provide heated seating within the home dugout
The Solution
The team delivered a complete solution: relocating the dugouts closer to the stands improved sight lines, strengthened the connection between pitch and supporters, and enhanced the matchday atmosphere.
Each dugout was bespoke, with greater capacity, comfort and quality finishes. Heated seating was added to the home dugout to support player performance, while embroidered seating reinforced the club’s identity. The referee’s dugout was future-proofed with space for VAR.
Delivered to tight off-season deadlines, the result is a modern, spacious dugout area that elevates the experience for players, officials and fans, while supporting the club’s ambition to continually improve facilities.
“The quality of the new dugouts is outstanding – they look fantastic and deliver exactly what we needed ahead of the new season.”
– Tim Davies, Chief Financial Officer

2.5
Tonnes total dugout weight

45
Seats Installed

1000
Fixings Used