Clean & Recoat of Steelwork

Clean & Recoat of Steelwork

Case Study

Wycombe Wanderers FC, Adams Park

Specialist clean and recoat of steelwork and roof structures delivered via rope access

Stadium Support Services delivered the full cleaning and recoating of 16 cantilever steel clusters supporting the main stand at Wycombe Wanderers Football Club. The project was completed using rope access techniques, with all works carried out at height up to 40 metres, across 1,000 sqm of exposed steelwork. The programme was delivered in 12 weeks, applying a two-coat industrial coating system to extend the life of the structure and protect against corrosion.


The Challenge

The works involved treating high-level steelwork and roof structures in a live stadium environment.
Traditional access methods would have been costly, time-consuming and disruptive to operations. The project required a solution that minimised impact on daily use, while maintaining the highest safety standards and ensuring long-term protection of the steelwork against corrosion.

 

Scope of Work

Team
Deployed a team of 8 IRATA & ICAT qualified rope access painters throughout the 12-week programme of works

Coatings
Applied a two-coat industrial protective system across 1,000 sqm of steelwork

Finish
Ensured structural coatings were applied to extend the lifespan of the cantilever steel clusters

Access
Delivered all works via rope access due to restricted site conditions and pitch protection requirements

The Solution
The steel clusters were located in highly exposed areas, subject to challenging weather conditions, which added complexity to the project.
Access was another major factor: the roof structure and new pitch meant no machinery could be driven onto the playing surface, leaving large sections of the steelwork unreachable by traditional methods.
Rope access was therefore the only practical solution, requiring skilled IRATA-qualified painters to operate safely at height.

 

We were impressed with how seamlessly Stadium Support Services delivered the project. They overcame complex access challenges with rope access and achieved a durable, high-quality finish.

Julie Hancock, Head Of Commercial, Wycombe Wanderers

Paint

16
steel clusters recoated

1000 sqm

of steelwork protected ICAT & IRATA Qualified Technicians

Hours

500+ shifts

to completion

Hours

12 weeks

to completion

Ascot Racecourse

Ascot Racecourse

Case Study

Ascot Racecourse

Ascot Racecourse

Steel Superstructure Survery, Cleaning and Coating

The Challenge

Stadium Support Services was appointed by Ascot Racecourse to complete a condition survey of the grandstand’s steel superstructure. Following a detailed assessment, we were instructed to carry out specialist cleaning and protective painting works to help preserve this iconic venue.
With no existing reports or access plans in place, Ascot Racecourse needed a full condition survey of its steel superstructure from the ground up. The challenge was to access a previously unaccessed grandstand develop a safe access strategy and deliver a long-term protection solution, while working around the venue’s live calendar to ensure minimal disruption

Scope of Work
  • Condition survey of coatings and passive fire protection
  • Rope access cleaning of external steelwork
  • Internal steelwork cleaned using MEWPs and specialist equipment
  • High-level pigeon spikes removed, cleaned and replaced
  • External window cleaning integrated into the programme
  • Cantilever brackets and structural steelwork prepped, primed and repainted

The Solution

Following the condition survey, our team used rope access and specialist equipment to restore both internal and external steelwork. Works included the replacement of high-level pigeon spikes and the full repainting of structural cantilever steels. The result was a fully restored superstructure, protected for the future, backed by warranty and supported with a clear long-term maintenance plan for Ascot.
“The team at Stadium Support Services were professional, reliable and safe. Working with them on a complicated project was made easy thanks to their clear communication, we felt informed throughout. They delivered on time and we are really pleased with the results.”
Lee Chalk, Head of Facilities, Ascot Racecourse

Hours

5,000sqm
cleaned

Hours

100+
days

SQM

60m
working at height

SQM

10,000+
hours worked

Bradford City AFC

Bradford City AFC

Case Study

Bradford City AFC, University of Bradford Stadium

Bradford City AFC, University of
Bradford Stadium

Club Shop Roof Replacement

As the official projects partner for Bradford City AFC, we were tasked with resolving significant issues in the club shop roof, which had deteriorated and developed extensive leaks. A thorough inspection confirmed the need for a complete rebuild to ensure a durable, weather-tight solution.

The Challenge

The roof project presented several challenges. Lifting the existing roof revealed extensive pooling in certain areas, a result of sealant failure and ageing. The structure’s deterioration made a full rebuild unavoidable. The decision was made to strip back the old roof and install a new apex roof to resolve all underlying issues with a more durable and reliable solution.

The Solution

The team undertook a comprehensive rebuild of the roof, which included installing new timbers, upgrading insulation, applying new boarding and re-felting. The new apex design was chosen for its improved durability while preventing any further water pooling.
The project was delivered as a complete turnkey solution, with all aspects managed by the team at Stadium Support Services. The team liaised with the local council to secure permits, coordinated scaffolding and oversaw the roof replacement from design to completion. Thanks to favourable weather conditions, the project was completed ahead of schedule, reducing the timeline from six weeks to four.
“The team’s expertise and efficiency exceeded expectations. The new apex roof is a significant upgrade and was delivered ahead of schedule. We’re thrilled with the result and grateful for the professional approach throughout.”
Paula Watson, Director of Operations, Bradford City AFC

Hours

2000 linear metres
 of timber

Hours

4 weeks
 to completion

SQM

400m2
roof area

Kia Oval

Kia Oval

Case Study

Kia Oval, London

Kia Oval, London

Verticulture Services

Introducing Verticulture, our new service dedicated to the care and maintenance of living walls by expert rope access technicians.

Living walls are rapidly gaining popularity across the UK, transforming buildings into greener areas that improve air quality, absorb noise, enhance well-being and boost biodiversity. However, maintaining them can be challenging, especially when it comes to accessing them without damaging plants or disrupting public spaces.

Verticulture combines “vertical” and “horticulture” to provide an eco-friendly solution for maintaining living walls. Our rope access technicians, trained in horticulture, can safely and efficiently reach even the most challenging areas without the need for heavy machinery, scaffolding, or bulky equipment. This reduces environmental impact, minimises disruption to tenants and the public and keeps costs lower for our clients

“Living walls are gaining momentum in the UK, and we’re committed to maintaining them in an environmentally friendly way. Our approach, combining expert horticultural care with rope access, ensures these ecosystems thrive while keeping disruption and costs low.” 

Daniel Scott, Head of Verticulture

What Makes Verticulture Different?

  • Efficient Access
    Our IRATA-trained specialists use rope access to access otherwise inaccessible areas, offering tailored solutions for even the most complex living walls.
  • Minimal Disruption
    With no need for large machinery or road closures, our work reduces noise and minimises disruption to tenants and the public.
  • Environmentally Friendly
    By negating the need to use diesel-powered machines, we lower emissions and create a more eco-friendly solution.
  • Rapid Response
    With no heavy equipment required, we can mobilise quickly for efficient and reactive maintenance.
  • Expert Care
    Our technicians focus on creating an ideal environment for your plants to thrive, ensuring the long-term health of your living wall.
  • Cost-Effective
    By avoiding expensive access equipment, we keep costs low without compromising on quality.

To see us in action, click here 

Contact Daniel@StadiumSupportServices.co.uk to find out how we can support your living wall maintenance.

Farnborough International

Farnborough International

Case Study

Farnborough International

Farnborough International

Leading Cleaning Operations, Farnborough Air Show

Stadium support services appointed to lead cleaning operations

Stadium Support Services resumes FIA2022 contract following four-ear Covid hiatus

Resuming the cleaning contract for the highly anticipated Farnborough Airshow 2022, Stadium Support Services once again deployed multiple expert teams to provide critical cleaning services throughout the event (18-22nd July). 

Flexible teams of highly skilled cleaners worked around the clock during the build, live, and breakdown phases of the show. Minimising disruption to guests and reducing the risk of trip hazards, Stadium Support Services championed Cordless Technology, to facilitate successful operations throughout the day. With 70,000m2 of exhibition space to deep clean every night, larger industrial cordless machines were brought in for the out-of-hours crew. 

Litter-picking teams played a vital role in delivering a clean site throughout the five days of the airshow. The proximity to Farnborough airport meant FOD (Foreign Object Debris) was a primary concern for its runways. Safety standards were continuously monitored by Stadium Support Services ensuring all runways were kept clear.

 

Leading the way in large-scale exhibitions and events, Farnborough International prides itself on working with expert, like-minded suppliers and partners to ensure a high-level experience at all areas of our 500,000sqm show site. As always, it has been brilliant to work with Stadium Support Services to deliver our extensive cleaning operation. 

Chris Dillon

Head Of Venue Operations Farnborough International

LED Light

100+ Staff per day

Door

4,000
Bin bags litter -packed 

Hours

70,000 sqm of exhibition space cleaned

Hours

75,000 visitors