Avon Point, Bristol
Case Study
Avon Point, Bristol
Post-Construction Façade Cleaning & Remedial Works
Stadium Support Services was appointed by RG Construction to deliver a post-construction clean and associated remedial works at Avon Point, a residential development comprising four interconnected tower blocks of varying heights in Bristol.
The project required specialist rope access expertise to safely access and clean external façades while coordinating with ongoing site activities.
The Challenge
A site survey identified that no integrated abseil system was in place across the development, requiring Stadium Support Services to design and deploy mobile weighted anchor systems to facilitate access.
Compounding the challenge, the building lifts were out of operation for four weeks, meaning all equipment and materials had to be manually handled to height.
Operatives were required to climb up to 12 storeys repeatedly throughout the project, demanding careful management of fatigue, welfare and safety.
As works progressed, the scope expanded to include façade snagging, mastic application, repointing and condition surveys of architectural elements.
Scope of Work
-
Supply of trained rope access technicians
-
Access to external façades across four interconnected tower blocks
-
Post-construction cleaning of glazing, window sills and metalwork
-
Installation of structural sealants and mastic as required
-
Identification and re-fixing of architectural metalwork elements
-
Careful management of exclusion zones and coordination with subcontractors
The Solution
A structured cleaning programme removed construction debris and staining from glazing, window sills and architectural metalwork. During the process, additional façade defects were identified, reported and rectified.
The rope access solution enabled works to be completed safely and efficiently without disrupting other trades on site.
Client Testimonial
“Stadium Support Services delivered a well-organised and professional service throughout a challenging post-construction clean. Their rope access team worked safely and efficiently at height, identifying additional façade issues and addressing them promptly. Communication was clear, and the works were completed to a high standard.”
–Marshall Clements, Construction Manager, RG Construction
52m
working height
600
windows cleaned
6
rope access operatives