Media Centre Fit-Out

Stadium Support Services were commissioned by QPR in partnership with Head of Operations, Joshua Scott, to transform a general office space with huge potential.

Ambitious plans to turn the third-floor offices into a dedicated media centre at The Loftus Road stadium were mutually agreed upon, and concept drawings were subsequently created by the client.

Developed to accommodate journalists for match day reporting, the area features a raised dual interview platform and media assembly point. The project also included a complete renovation of the surrounding rooms.

  • C-Suite Executive offices
  • Meeting rooms
  • Media hot desk banks
  • Full LED lighting upgrade and installation
  • Fire doors
  • W/C conversions
  • Kitchen
  • Carpet
  • Air conditioning systems
  • Decorate throughout

Challenge

An exciting transformational project became a more challenging proposition due to the limited timeframe in which to complete the work.

Home games were subject to a short break while the World Cup took place in Qatar, leaving a small window of opportunity to drive the development to completion.

Culminating in only 3 weeks to carry out the plans, the development required; precision planning from highly skilled teams, and the ability to pivot quickly to any design or operational changes resulting from the tight timeframe.

Solution

With multiple teams ready to deploy as soon as the space within Loftus Road was available for access, Stadium Support Services worked to rapidly strip out the existing layout and fixtures.

All elements of the build were timebound and resulted in the quick and efficient installation of each planned area. Multiple tradespeople overlapped to hit each daily objective, whilst maintaining a safe working environment.

Result

An impressive, premier league standard, multi-purpose media suite, with a creative lounge, press office, VIP speaker room, and AV equipment for dedicated media access.

A flexible and cross-functional space, the new centre also comprises breakout meeting rooms providing delegates with complete privacy for virtual or in-person meetings.

Stadium Support Services were exemplary in their approach to such a pivotal and important project for the QPR club. The new central media hub was developed to provide the very latest access to games, players, and news in real time.

The short window of opportunity to access the space while the World Cup played out in Qatar was challenging, and as always, the teams delivered an exceptional Media Centre in record time

Joshua Scott

Head of Operations, QPR

With multiple teams ready to deploy as soon as the space within Loftus Road was available for access, Stadium Support Services worked to rapidly strip out the existing layout and fixtures.

400m2 Space

300+ Litres of paint used

100 Led Lights Installed

1,000m2 Cable installed

Olympic Park Stadium, London

Olympic Park Stadium, London

Case Study

Olympic Park Stadium, London

Olympic Park Stadium, London

Health & Safety Compliance

Ramping up Health & Safety

With thousands of spectators and visitors entering our venues, health and safety (H&S) as well as accessibility is always at the forefront of Stadium Support Services priorities. 

The Challenge:

Stadium Support Services was called to address a breach of health and safety at the Olympic Park Stadium. A temporary structure had been erected with ramps that did not meet strict H&S guidelines and as such was deemed not fit for purpose. Furthermore, with just 24 hours before the first Rugby World cup match to be played at the venue our team had to act fast to find a solution.

The Solution:

Once the problem was identified our H&S officer was able to assess the drop between the temporary structure and the concourse.  From this they were able to calculate the precise angle of the ramp to provide both the optimum use of space and the approved gradient suitable.

The Outcome:

Materials and quantities were ordered and collected on a same day order and a team of six skilled carpenters started construction of the 80 square metre ramps complete with anti-slip flooring and handrails, completing the job in time for the evening kick-off.

As stadium specialists, we fully understand the importance of delivering projects on time within a live venue.

Twickenham Stadium

Twickenham Stadium

Case Study

Twickenham Stadium

Twickenham Stadium

Complete Corporate Box Renovation

Painting to perfection

Corporate hospitality plays such a significant part in attracting revenue for every stadium. It is therefore imperative those paying for the premium experience, experience a premium environment.

The Challenge:

Twenty three days to renovate all the corporate boxes located in the Upper West Stand of Twickenham Stadium, including all corridors, ceilings and lift lobby areas – all before the first kick off of the Rugby World Cup 2015. 

Combine that with access restrictions and complex fire retardant wood surfaces to work with, Stadium Support Services were willing to take on a project no other company would attempt.

The Solution:

A huge team effort meant multiple teams of painters working around the clock to decorate the hospitality boxes, kitchens, corridors and lift lobby’s in time for the tournament.

The Outcome:

In total over 2,500 man hours were used to complete this commission. Stadium Support Services was keen to accept the challenge and proud to once again have met and exceeded all expectations with the job finishing on budget and ahead of schedule.

Photo by: David Roberts from London, United Kingdom – Australia vs. Wales

As stadium specialists, we fully understand the importance of delivering projects on time within a live venue.